How to install tpo roof membrane easy photo guide step 1.
Tpo roofing installation instructions.
To install jm tpo roofing systems including.
Beginning at the low edge of the roof cut the membrane to length if necessary and position the sheet according to the instructions in the fully adhered or mechanically attached section of this guide.
Installing hot air welding membrane sections using prefabricated jm tpo coated metal parts seam testing using fasteners to anchor the roof to the roof deck and adhesive application of the membrane.
Tpo s long term heat uv and natural fungal resistance plus flexibility without need for plasticizers also make tpo a reliable low slope roofing system.
For proper installation there should be no welder drag.
Membrane installation 1 start at the low point of the roof and perpendicular to the slope 2 place roof membrane so that wrinkles and buckles are not formed.
Seaming precautions before welding ensure area is clean and dry.
After the roof surface has been prepped the next step is installing the insulation.
1 install polyester or fibreglass separator sheet where required by roofstar guarantee standards.
It is important to be careful when probing seams because.
Also it is really.
B stir the approved firestone primer thoroughly before and during use.
5 installation of roofing.
C dip the firestone quickscrubber or quickscrubber plus into the bucket of primer keeping the scrubber flat.
Test welds should be done at least twice daily at the start of the day and after lunch.
This manual is a guide to the design and installation of steel roofing and walling manufactured by lysaght.
Short for thermoplastic polyolefin tpo is a single ply roofing membrane that offers excellent performance at a cost effective price.
Start at the low point of the roof and position a perimeter 39 or 991mm roll of tpo roof membrane square with the roof edge.
Jm requires that the following guidelines be followed.
Heat welded seams provide superior strength.
Prime area to receive flashing a clean the application surfaces to remove heavy debris or contaminates with a rag or broom.
Mechanically attach underlying sheet at the lap to the structural deck with fasteners.
Use extra care to ensure that any moisture is removed from the deck.
The preparation includes making sure that you have all the materials delivered and you have all.
We refer only to genuine steel roofing and walling manufactured by us and marketed under our brand names.
A contractor needs to align the inside edge of the nozzle.